You are in: JCT > Training

Logged in as Guest: login / register
express your interest in this course add to basket

MOVA Design, Specification and Validation

JCT Offices, Lincoln  18.07.2022



Who should attend.

Attendees should have a good basic understanding of UK traffic signals including Phases, Stages, Intergreens and Interstages. These topics are covered on other JCT courses such as "An Introduction to Traffic Signals". Whilst it is not imperative to have extensive site experience attendees should have at least a very basic understanding of the components of a Traffic Signal Installation including the structure of Controllers, Detector Loops and Out Station Transmission Units.


Prerequisites.

Understanding of UK Phases, Stages, Intergreens and Interstages, basic understanding of Traffic Signal Installations


Course content.

The following topics are covered:

Introduction to MOVA: Basic theory of MOVA operation, Benefits of MOVA, Estimating MOVA modelling the benefits

MOVA Design: Types of MOVA detectors, locations and uses, Alternatives to loops for MOVA detectors, Options for right turn control under MOVA, Staging a junction for MOVA

Controller Specification: Writing relevant pages of ITS1827 to specify MOVA interface including UTC Interface,  Phase Confirms and Detectors, Special Conditions

Workshop Exercises – Design and Specification: Setting out of detectors on a plan, considering road speeds and how to control right turns. Creating appropriate stages, a stage order and specify the MOVA Interface.

Structure of a MOVA Dataset: Explanation of the basic structure of a MOVA dataset, consisting of links, lanes, detectors and stages, and the definition of each.

MOVA Tools: Working through MOVA Tools, page-by-page, looking at the structure and parameters for Controllers, Signals, MatricesLinks, Lanes, Detectors, SD Codes 

Workshop Exercises - Dataset: Writing the relevant controller specification forms and configuring a MOVA Dataset for the site designed in the prior workshop.

MOVA Versions and Hardware: Versions and facilities,  Integral platforms, Non-integral Outstations

Communicate and Configure MOVA Outstations: Connecting and communicating, Basic configurations, Uploading and downloading datasets

Integrating MOVA with SCOOT: Configuring and controlling MOVA on a SCOOT Site, using UG405 and basic commands.

Validating MOVA Operation: Principles of why and how MOVA is validated, understanding: Troubleshooting common errors and problems, Key validation parameters and what to check, Signs of a well performing MOVA Site

Basic MOVA Linking: Summarising the basic techniques to link MOVA Streams or sites, including: Theory and practical applications of linking, Examples of Special Conditions, Passing Links between stages and streams

 


Accreditation.

All JCT courses are Approved or are pending Approval by the Institute of Highway Engineers and attendance is therefore recognised by the IHE and many other bodies as evidence of Continual Professional Development (CPD).

Courses are managed under a ISO9001 Quality Management System.








download a pdf containing course information

 

 

Your basket:

is empty.

 
 

Site search



 
 

Upcoming courses

13 May 2024: Understanding and Optimising Mobile Technologies for traffic and transportation applications ...more

13 May 2024: Practical Application of MOVA Computer Workshop including the use of MOVA Tools and MOVA Simulation ...more

14 May 2024: Introduction to Traffic Signals ...more

21 May 2024: Online Basic Introduction to Traffic Signals for SCATS based regions (€90 discount for ITS Ireland members) ...more

04 Jun 2024: Interpretation and writing of TOPAS 2500 Controller Specification forms for Transport Modellers and Design Engineers ...more

...view full schedule

...view course descriptions

 
 

Subscribe to email updates

To subscribe to Course, Software or Symposium update emails, please click here